Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
disassembly DC-in Cable
1. Loosen screw - M2x12 (6052B0127701) * 2.
(Fig.1)
2. disassembly DC-in cable. (Fig.2)
0.1
2013/08/23
22(1/1)
Electric cross screwdriver (#1) 1
Fig.1
Fig.2
1
2