Standard Operation Procedure
Document No. Cyclone 15B LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
1. Take the LCM module on the working table
(Fig. 1)
2. Rip the mylar, then disconnect the LCD
cable. (Fig.1)
3. Recycle LCM module
Fig.1
4(1/1)
2013/08/27
0.1
disassembly LCD