Standard Operation Procedure
Document No. Cyclone 15B LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
disassembly Hinge BRKT
6(1/1)
2013/08/27
1. Loosen screw (6052B0120001) * 2. (Fig.2)
2. disassembly hinge BRKT – R & L and recycle
them .
Electric cross screwdriver(#1) 1
Fig.1
Fig.2
0.1
1
2