EasyManua.ls Logo

HP ProCurve 3500 - Page 48

HP ProCurve 3500
130 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-12
Installing the Switch
Installation Procedures
Installing the Switch
5. (Optional) Install or Remove a Transceiver
Note Hot swapping transceivers is supported. You can install or remove a
transceiver with the switch powered on, a reset will not occur. You should
disconnect the network cables from the transceivers before hot swapping
them.
a. Slide the transceiver in until it stops.
1
Figure 2-9. Installing a fiber optic transceiver.
1
If you are using the yl module in either of the 3500yl or 6200yl switches with an X2 transceiver
installed, the operating ambient temperature should not exceed 40C (104F).
b. Push firmly until the gasket seats against the bulkhead.
Figure 2-10. Securing a transceiver bail.
Note When switch power is on, the Link and Activity LEDs will come on for
approximately two seconds and then go off. This is confirmation the
transceiver is completely seated.
c. If your transceiver has a bail, move the bail up, if not your transceiver is
now completely installed.
To remove the transceiver:
If your transceiver has a bail, lower the bail until it is approximately horizontal,
and then using the bail, pull the transceiver from the slot. If your transceiver
does not have a bail, pull the transceiver straight out.
Bail

Related product manuals