Hardware options installation 77
4.
Do one of the following:
o For tower models, place the server on a flat, level surface with the access panel facing up.
o For rack models, extend the server from the rack (on page 27).
5. Remove the access panel (on page 25).
6. If installed, remove PCI air baffle ("Remove the PCI air baffle" on page 28).
7. Remove the system air baffle ("Remove the PCI air baffle" on page 28).
8. Remove the fan cage (on page 31).
9. Remove the full-length expansion board retainer, if any full-length expansion boards are installed.
10. Remove the expansion slot cover.
11. Install the expansion board.
12. Connect any required internal or external cables to the expansion board ("System board components"
on page 11). See the documentation that ships with the expansion board.
13. Install the full-length expansion board retainer, if any full-length expansion boards were removed.
14. Install the fan cage.
15. Install the system air baffle (on page 30).
16. Install the PCI air baffle (on page 29), if removed.
17. For tower models, do the following:
a. Install the access panel (on page 26).
b. Return the server to an upright position.
18. For rack models, do the following:
a. Install the access panel (on page 26).
b. Slide the server back into the rack.
19. Power up the server (on page 22).
20. Do one of the following:
o For tower models, install the bezel ("Install the tower bezel" on page 23).
o For rack models, if removed, install the security bezel ("Security bezel option" on page 47).