EasyManua.ls Logo

HP ProLiant ML350p - Page 64

HP ProLiant ML350p
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware options installation 64
4.
Connect the power cord to the power supply.
5. For rack servers, use the strain relief clip from the server hardware kit to secure the power cord.
6. Connect the power cord to the power source.
7. Be sure that the power supply LED is green.
Hot-plug SAS drive options
When adding drives to the server, observe the following general guidelines:
The system automatically sets all device numbers.
If only one drive is used, install it in the bay with the lowest device number ("SAS and SATA device
numbers" on page 15).
Drives should be the same capacity to provide the greatest storage space efficiency when drives are
grouped together into the same drive array.
Removing the drive blank
1. Do one of the following:
o For tower models, open and remove the bezel ("Remove the tower bezel" on page 20).
o For rack models, if installed, remove the security bezel (on page 20).
2. Remove the drive blank.
Installing a hot-plug drive
WARNING: To reduce the risk of injury from electric shock, do not install more than one drive
carrier at a time.
The server can support six drives in a LFF configuration, or eight drives in a SFF configuration.
To install the component:
1. Do one of the following:
o For tower models, open and remove the bezel ("Remove the tower bezel" on page 20).
o For rack models, if installed, remove the security bezel (on page 20).

Other manuals for HP ProLiant ML350p

Related product manuals