EasyManua.ls Logo

HPE Edgeline EL8000 - Page 23

HPE Edgeline EL8000
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IMPORTANT: The 2U server blades must be installed in bay 1 and bay 5.
Prerequisites
Before performing this procedure, make sure that you have the T-15 Torx key available.
Procedure
1. Align the blade and install it in the chassis:
a. Insert the blade in the chassis.
b. Close the latch on the server blade and secure it.
2. Optional: Lock the server blade.
Associated hardware procedures 23

Table of Contents