3 
Initializing the Storage System 
A generic view of cable connections 
(Optional) Connecting ground cables 
Connecting the storage system to 
the network 
Connecting to the maintenance 
terminal 
Connecting power cables 
Checking device installation 
Checking cable connections 
Switching on external  
power supplies 
Pressing the power button 
on the device 
Checking status indicators 
Installing front panels 
Installation Preparations 
Installing  
Devices 
Connecting Cables 
Powering On the 
Storage System 
Checking Hardware Installation 
(Optional) Installing Host Software 
Checking installation tools 
Checking circuit breakers 
Checking components 
Planning device installation positions 
Removing filler panels from device 
installation positions 
Determining device installation 
positions using installation templates 
Installing guide rails 
Installing storage devices into the  
cabinet 
(Optional) Installing disk modules 
(Optional) Installing filler panels 
Installation Process 
Connecting disk enclosures (Inapplicable 
to Dorado5000 V3 (NVMe) V300R002C00) 
Connecting the Dorado NAS unit 
(applicable to V300R002C10 and later)