Lists documents required for RRU installation.
Lists essential tools and instruments for RRU installation.
Details qualifications and training needed for installation personnel.
Describes the external appearance and dimensions of the RRU.
Details the ports located on the RRU panels.
Explains the meaning of the six indicators on the RRU.
Covers different installation locations and requirements.
Specifies clearance and spacing requirements for RRU installation.
Defines recommended and minimum clearances for a single RRU.
Specifies clearances for installing multiple RRUs.
Details horizontal and vertical spacing requirements for multiple RRUs.
Describes procedures and precautions for hoisting RRU and mounting kits onto a tower.
Details the procedure and precautions for hoisting fiber optic cables onto a tower.
Explains procedures and precautions for hoisting power cables onto a tower.
Describes the bracket assembly and attachment plate for an RRU.
Covers procedures for installing RRU on a pole.
Details the procedure for installing a single RRU on a pole.
Describes the procedure for installing two RRUs on a pole.
Outlines the procedure for installing three or more RRUs on a pole.
Describes procedures for installing RRU on U-steel.
Details procedures for installing RRU on angle steel.
Covers procedures for installing RRU on a wall.
Explains procedures for installing RRU on an IFS06.
Specifies requirements for laying out cables to prevent signal interference.
Describes cable connections for single and multiple RRUs.
Outlines the overall process for installing RRU cables.
Lists RRU cables and their connection details.
Details the procedure for installing the RRU PGND cable.
Describes the procedure for installing an RRU RF jumper.
Explains procedures for installing AISG multi-wire and extension cables.
Details the procedure for installing an RRU alarm cable.
Describes the procedure for opening the RRU cabling cavity cover plate.
Covers the procedure for installing an RRU power cable.
Details the procedure for installing a CPRI fiber optic cable.
Describes the procedure for closing the RRU cabling cavity cover plate.
Describes how to add a tool-less female connector to the RRU power cable.