EasyManua.ls Logo

Humbaur HBT - Page 64

Default Icon
316 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
66
Operation
Check before departing and when parking
3
Departure check
Trailer properly coupled.
Brake and supply lines are
connected.
Hydraulic lines are connected.
Electrical lines and & EBS cable are
connected.
Side guard is down and secured.
Support equipment is up and
secured.
Platform gates/curtains/posts are
closed and secured.
Screw parking brake/spring-loaded
parking brake is released.
Raising/lowering system is in drive
position.
Toolbox is closed and secured.
Ramp planks are slid in, ramp plank
bay is closed and secured.
Drive-up ramps are up and secured.
Wheel chocks are properly secured.
Warning signs are retracted and
secured.
Check when parking
The trailer is properly uncoupled.
Screw parking brake/spring-loaded
parking brake is actuated.
Wheel chocks are under the wheels.
Support equipment is extended and
secured.
Brake and supply lines are
disconnected and parked.
Electrical line & EBS cable are
disconnected and parked.
Hydraulic lines are disconnected and
parked.
Raising/lowering system is in park
position.
Platform gates/curtain are closed.
Posts/lashing equipment are stowed.
Toolbox is closed.
Ramp planks are slid in, ramp plank
bay is closed and secured.
Drive-up ramps are up and secured.
Warning sign is extended.

Related product manuals