11
5.3.2 Firmware(Solar Eagle)introduction
We have developed software that completely monitors and allows for many
parameter changes via a computer.
6. Steps for Commissioning or Shutdown
6.1 MPPT controller work step
Please make sure the controller is properly wired.
Step 1: Close the battery breaker or make connection with the battery bank. Some
led’s and the lcd should illuminate.
Step 2: Now make the PV connection. If the PV module voltage is in the charging
range, then the controller will start to work .
6.2 Steps for Proper Shutdown
Step 1: Open the PV breaker to disconnect panels from controller.
Step 2:Open the battery breaker or disconnect controller from battery bank. This
will completely shut the controller to off.
Caution: Follow the steps for shutdown to avoid damage
.
Warning
NEVER disconnect the battery while charging.
This will cause permanent damage to the controller and is not
covered under the warranty. Always disconnect PV panels
first.
Caution :Please follow the steps to ensure proper programming.