© Copyright IBM Corporation 2019, 2020, 2021. Customer Install Guide, 2U Chassis 30
Figure 15. Cable management arm installation (left orientation)
4. Align two outer mounting clips with the outer tabs on the slides; then, push
them until they snap into place.
ALL OPEN RACK BAYS REQUIRE FILLERS TO PREVENT HOT AIR FROM
RECIRCULATING TO THE FRONT OF THE RACK AND INTO THE COLD
AIR INLETS.
DO NOT BLOCK ANY INLET OR EXHAUST DUCTS, VENTS OR PORTS
KEEP ALL POWER CORDS, SIGNAL CABLES AND TRANSCEIVERS WITH
THE INSTALLED CHASSIS FOR USE BY IBM INSTALLERS.
DO NOT POWER-ON THIS CHASSIS. POWER ON WILL BE DONE BY YOUR
IBM INSTALLATION TEAM.