EasyManua.ls Logo

IBM 900 - Page 112

IBM 900
390 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Select/BypassSwitch
Figure 3-19. Select/Bypass Switch on V-Cable
11. Run diagnostic tests (see “Testing the Adapters” on page 5-49) to verify that
the adapter and cables are OK.
12. Tell the host computer operator that the channel can be returned to an
operational state.
13. Return to the procedure that brought you here.
3-42 3746-9X0: MAE Installation and Maintenance

Related product manuals