EasyManua.ls Logo

IBM 900 - Page 267

IBM 900
390 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix D. Controller Expansion Component Locations
If you want more information about: Refer to
Positioning the units in the front side of the controller expansion
Positioning the units in the rear side of the controller expansion
Installing captive nuts and brackets (for 7585)
Installing captive nuts for LCBs
Installing captive nuts for 8229s
Installing captive nuts and brackets for MAE
Installing brackets for processor type 6275 or 7585
Example of units installation (processor type 7585)
Example of units installation (processor type 7585 + MAE)
Example of units Installation (SP and NNP Type 6275)
Example of units Installation (SP and NNP Type 6275 + MAE)
Connecting the units to the ac Outlet Distribution Box.
Connecting the Units to the Dual ac Outlet Distribution Boxes
Figure D-1 on page D-2
Figure D-2 on page D-3
Figure D-3 on page D-4
Figure D-4 on page D-5
Figure D-5 on page D-6
Figure D-6 on page D-7
Figure D-7 on page D-8
Figure D-8 on page D-9
Figure D-9 on page D-9
Figure D-10 on page D-10
Figure D-11 on page D-10
Figure D-12 on page D-11
Figure D-13 on page D-11
Copyright IBM Corp. 1998, 1999 D-1