EasyManua.ls Logo

IBM Power System 9040-MR9 - Page 97

IBM Power System 9040-MR9
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 84. Connecting the power cords
11. When the service processor comes up to the standby state (the power-on LED on the control panel is
flashing slowly), continue to the next step.
12. Turn off the identify LED. For instructions, see Deactivating an identify LED (www.ibm.com/support/
knowledgecenter/POWER9/p9haj/p9haj_turn_off_identify_led.htm).
13. Start the system. For instructions, see Starting a system (www.ibm.com/support/knowledgecenter/
POWER9/p9haj/crustartsys.htm).
14. Verify the installed part.
If you replaced the part because of a service action, verify the installed part. For instructions, see
https://www.ibm.com/support/knowledgecenter/POWER9/p9ect/
pxect_verifyrepair.htm (www.ibm.com/support/knowledgecenter/POWER9/p9ect/
pxect_verifyrepair.htm).
If you installed the part for any other reason, verify the installed part. For instructions, see https://
www.ibm.com/support/knowledgecenter/POWER9/p9haj/pxhaj_hsmverify.htm (www.ibm.com/
support/knowledgecenter/POWER9/p9haj/pxhaj_hsmverify.htm).
System backplane for the 9040-MR9
83

Related product manuals