11
ENGLISH
2. Start-up
Once the installation instructions are followed (ventilation, site conditions, temperatures, water quality,
etc.), proceed as follows:
1. In the case of modular modules, remove the cover to access the installation kit (lters, connection hoses,
dispersion cones, etc.).
2. In case of compact models, open the deposit door to access the installation kit.
3. Open the water inlet. Verify the existence of leakages.
4. Connect the machine to the electrical network.
5. Verify that there are no vibrations or frictions on the elements.
6. After the 10 minutes of the timer installed in the electric panel, the machine will start the operation.
7. In the case of modular models (mainly in three-phase equipments), having the cover removed, verify that
the motor is rotating in the correct direction.
8. Verify that after 15 minutes, the frost on the aspiration pipe is at 20 mm (0.78 in) of the compressor.
CAUTION:
INSTRUCT THE USER ABOUT MAINTENANCE, INFORMING THAT
MAINTENANCE AND CLEANING OPERATION AS WELL AS DAMAGES
DUE TO THE LACK OF SUCH OPERATIONS: ARE NOT INCLUDED ON THE
WARRANTY.
The technical installer shall invoice traveling costs, hours and materials used on such operations.
MAINTENANCE AND CLEANING INSTRUCTIONS
CAUTION: Maintenance and cleaning operations and damages as the lack of those activities: Are not
included on the warranty.
If a good maintenance is performed, the machine will continue producing a good quality ice and will be free
of damages.
Maintenance and cleaning intervals will depend on the conditions of the location and water quality.
CAUTION: At least, one revision and cleaning should be performed every six months.
On dusty environments, it might be necessary to clean the condenser on a monthly basis.
MAINTENANCE AND CLEANING PROCEDURES:
** CAUTION: For all cleaning and maintenance operations: Disconnect the machine from the power
supply.