EasyManua.ls Logo

ICP H9MPX - Page 3

ICP H9MPX
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
START-UP CHECK SHEET
For 95% Furnace
(This sheet is optional. Keep this page for future reference.)
Date of Start-Up:
Dealer Name:
Address:
City, State(Province), Zip or Postal Code:
Phone:
Owner Name:
Address:
City, State(Province), Zip or Postal Code:
Model Number:
Serial Number:
Setup Checks
Check the box when task is complete
All Electrical Connections Tight?
Have hoses been relocated for furnace application
(upflow/horizontal)?
Condensate Drain Connected?
Condensate Drain Trapped?
Manual Gas Shut-Off Upstream of Furnace/Drip-Leg?LU
Gas Valve turned ON?
Type of Gas: Natural: Lj
Filter Type and Size:
Propane: Lj
Calculated Firing Rate:(See Checks and
Section)..
Heating Check
Measured Line Pressure when Firing Unit:
Measured Manifold Gas Pressure:
Temperature of Supply Air: (o)__
Temperature of Return Air: (o)__
Temperature Rise (supply-return temperature): (o)__
In Rise (see furnace rating plate)? (o)__
Static Pressure (Ducts): Supply Air Return __
Which blower speed tap is used? (Heating)
Optional Check: CO ? CO2 ?
Cooling Check
Temperature of Supply Air: (o)__
Temperature of Return Air: (o)__
Temperature Difference: (o)__
Static Pressure (Ducts) cooling: Supply Air Return
Blower Speed Tap used for cooling:
Dealer Comments:
Adjustments
440 01 1051 03 Specifications are subject to change without notice. 3

Related product manuals