11. Remove 4 screws on each rear gas pipe support
channel and discard channels.
16. Fit Slave inner fascia panel to Slave Module securing with 2 x
M5 screws whilst re-tting ribbon cable to display board.
12. Replace with the one piece rear gas pipe support channel and
secure with 6 screws (located in casing assembly pack).
15. Fit master fascia panel securing with 2 x M4
screws. Ensure ribbon cable is re-tted.
14. Place top panel onto both modules and
secure at rear with 2 x M5 screws (supplied).
13. Tie support the thermistor harnesses on each boiler module.
The thermistor harness is located towards the rear of each
boiler module. Using the 4 tie wraps supplied in the casing
assembly pack, tie the harnesses to the 4 holes located on
the inside face of the rear support channel.
11
ASSEMBLING THE MODULES .... CONTINUED
INSTALLATION