EasyManua.ls Logo

IFB Executive Elite - Machine Levelling and Connections

IFB Executive Elite
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Check that the electrical line can take the required
load.
2. Connect to a 220V, 50 Hz single phase AC supply.
3. Machine must be earthed properly before
operation. This can be done by using a 3 pin plug
and properly earthed socket of 16 ampere rating.
4. Ensure that there is a firm connection between the 3
pin plug and socket, else it may result in sparking and
subsequent failure of 3 pin plug.
5. Use of extension cord not recommended.
6

Related product manuals