EasyManua.ls Logo

Indel B KD 50 ECOSMART - CUSTOM WOOD PANEL INSTALLATION (VERSION 2)

Indel B KD 50 ECOSMART
158 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
35
Forniture Handle
Wooden Door Panel
370
205
245
285
410
3
50
100
19857
The hotel’s wooden door panel has to
be in accordance with the below condi-
tions:
Max. weight: 2 kg
Thickness: 20 mm
Installation: Fixed with 8 screws
inside out (Red
Circle, in P4)
Lock hole drilling: Diameter of 28mm
(Green Circle, in P4)
Handle drilling: Fixed with 2 screws
inside out (Blue
Circle, in P4)
INSTALLATION OF FURNITURE WOODEN PANEL FOR V2
Remove the large drawer.
Remove the caps of wooden panel xation holes (8 pcs).
Fix the wooden door panel with screws inside-out (8 pcs).
Insert the caps of the holes (8 pcs).
Install the large drawer.
Check the gasket whether it is fully sealing.
Adjust the door, if not.

Table of Contents

Related product manuals