EasyManua.ls Logo

Inferno LCD710 - Charging Steps

Inferno LCD710
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN_USER GUIDE // 8
CHARGING STEPS
STEP 1: DIAGNOSIS (Check if battery has connected with the charger and also check battery voltage).
STEP 2: DESULPHATION (If battery voltage is too low, programs automatically
generate pulsing current to remove sulphate, up to 10 minutes).
STEP 3: ANALYSE (Check if the battery voltage reaches to the threshold after
desulphation, and charging begins if the battery voltage is OK).
STEP 4: SOFT START (Charge with echelon constant current).
STEP 5: BULK (Charge with constant maximum current until battery
voltage is reached to the threshold).
STEP 6: ABSORPTION (Provide gradually declining current charge for maximum battery voltage).
STEP 7: ANALYSE (Test if the battery can hold charge).
STEP 8: MAINTENANCE (Continuously monitor the battery, and charging
current will intelligently adapt to the variable battery voltage).
Battery charger >
8-STEP
STEP
Voltage (V)
Current (A)
1 2 3 4 5 6 7 8

Related product manuals