EasyManua.ls Logo

Infinite L-com SRWQ100-pH104-8701 - Electrode Installation

Infinite L-com SRWQ100-pH104-8701
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
Put the electrode in pH 6.86 or 7.00 buffer solution and
wait until the value is stable, calibrate the first point .
Then take the electrode out of the buffer solution, rinse
and dry it with a paper towel.
Put the electrode in pH 4.01 or 9.18 buffer solution and
wait until the value is stable, calibrate the second
point .Then take the electrode out of the buffer solution
rinse and dry it with a paper towel.
Electrode Installation
It is recommended pH electrode to be installed in the flow cell for more stable and
accurate measurement.
If electrode is installed in the pipe, the right angle should be 15°~165°.
Follow the procedure below: