EasyManua.ls Logo

inform PDSP 33040 - User Manual

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
288717215 KULL.KILAV.PDSP 10-120KVA A4 ING. INF511-Y01-U727-1-00
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
a
a
n
n
d
d
O
O
P
P
E
E
R
R
A
A
T
T
I
I
N
N
G
G
M
M
A
A
N
N
U
U
A
A
L
L
PYRAMID DSP SERIES .
THREE PHASE IN THREE PHASE OUT
THREE PHASE IN ONE PHASE OUT
UNINTERRUPTIBLE POWER SYSTEMS
10-40kVA
10-120kVA
Question and Answer IconNeed help?

Do you have a question about the inform PDSP 33040 and is the answer not in the manual?

Summary

Warranty Information

Safety Precautions for UPS

Important Notice for UPS

General safety guidelines and warnings for UPS installation and operation.

Important Notice for Battery

Critical safety information and handling procedures for UPS batteries.

Symbols on UPS Labels

Explains symbols found on UPS labels for hazard identification.

UPS Requirements

Electrical Requirements

Specifies electrical standards and connections for UPS installation.

UPS Installation and Connections

Unpacking and Moving Procedures

Step-by-step guide for removing the UPS from packaging and moving it.

Power Connection Procedures

Detailed steps for making electrical power connections to the UPS.

Input Power Connection

Steps for connecting the main power input to the UPS.

Battery Connection

Procedures for connecting the battery power to the UPS.

Output Connection

Steps for connecting the UPS output to the loads.

UPS Operation Modes

UPS Operating Procedures

Preparations for Operation

Steps to prepare the UPS before initial startup.

UPS Commissioning

Procedures for commissioning and starting up the UPS.

Start-Up UPS with Internal Battery

Step-by-step guide to start the UPS with internal batteries.

Start-Up UPS with External Battery

Step-by-step guide to start the UPS with external batteries.

Parallel System Operation

Parallel System Commissioning

Steps for commissioning UPS units in a parallel configuration.

UPS Maintenance

Battery Maintenance

Guidelines and frequency for maintaining UPS batteries.

Troubleshooting Guide

inform PDSP 33040 Specifications

General IconGeneral
Frequency50/60 Hz
Battery TypeSealed Lead-Acid (SLA)
Battery Runtime5-10 minutes at full load
Efficiency90%
Operating Temperature0°C to 40°C