Dryer must be level to reduce noise and _ssure proper
performance.
slide dryeronto cardboard or hardboard before moving
across floor to prevent floor damage.
Movedryercloseto itspermanent location.Leaveenough roomto
connectexhaustvent.Removecardboard orhardboard from
under dryer.
_eck levelnessof dryerbyplacinga levelontop of dryer,first
sideto side,then front toback.Ifdryerisnot level,adjustdryer
legsup ordown.
Iflegs are notlongenough tolevel dryer,orderExtendedDryer
FeetKit,Part No.279810 (soldtwo legsper kit),fromyour
dealer.
On deit ajuster l'aphanb de la s&heuse pour minimiser le
bruit et garantir an rendeanent optimal.
PLacer ks s&hense sur une feuille de carton ou de
pannean dur avant de ks d_placer, pour _viter
d'endemmager le pksneher.
D_lacer la s&heuse jusqu'_,son emplacementd'installation
permanent. Laissersufnsammentd'espace librepour le
raccurdementdu conduitde decharge.Retirerla feuillede carton
ou de parmeaudur de dessous las&heuse.
Omtr61erl'aplomb avecnn niveauplac_sur la table dela
s_cheuse;contr61erl'aplombtransversalementct dansle sens
avant/arri_re.Sila s_cheusen'est pasd'aplomb, ajusterh
kingueurdes pieds.
Siles piedsne snnt pas suffmemmentkingspourpermettre un
bnnr_ghgede l'aplomb de la s&heuse, commanderl'ensemble
de pieds kings,pi&e no 279810 (denxpieds par ensemble), chez
nn coneessionnaire.
Removetheredcap (A)from the gaspipe.
Connectgas supplyto dryer. Usepipe-jointcompoundresistantto
theaction of L.P.gasfor gas connections.Ifflexiblemetaltubing
isused, be certainthere are no kinks.
0ter le capuchnn rouge(A) dutuyauderaccordement.
Raccorderla canalisationde gaz kh s&heuse.Pourles
connexions,utilisernn compos_d'_tanch_t_r_sistantan
propane. Sionutilisenn conduitde eaccordementm_tallique
flexible,v€llleritce qu'ilne soitpas _eras_ou deformS.
Turnthe shutoffvalve(B) in the gassupplyline to the "open"
position.
Usea brush and liquid detergentto test allexternalgas
connectionsfor leaks. Bubblesaround connectionswillindicate a
leak.Ifa leakappears, shutoffgasvalvecontrols andtighten
connections.Thencheck connectionsgain.
onvrir le robinetd'arr_t(B) de h canalisationd'arriv_edegaz.
Pourrechercherdesfuitesauniveaudes connexions,
badigeonnerles connexionsavecnn pinceau imbib_de d_tergent
liquide.Laformationde buUesanniveaud'uneconne_nn
indiqueranne futie,s'il y a desindices defuite,fermerle robinet
d'arr_tetresserrerles connexinns.Ensuite,tester denouveau
pour rechercher desfuites.
• |
Using a 10.2-em O-inch) clamp (A), connect exhaust vent to
exhaust outlet in dryer. If connecting to existing exhaust vent,
make sure the vent is clean.
Thedryerexhaustventmust fit overthe dryerexhaust outletand
insidethe exhausthood.
Makesure exhaustventis securedto exhausthood with a
10.2-em (4-inch) clamp.
Movedryer intofinalposition.Do not crush or kink exhaustvent.
Makesure dryer islevel.
Aumoyend'nnebride (A) de 102 mm (4po), raccorderle
conduitd'@acuatinn_.labouche de ddchargedela s_cheuse.Si
leraccordest effecto_sur nn conduitd'@acuatinnexistant,
s'assurerque le conduitestpropre.
Leconduitd'&acuatinn deit s'emboRerpar-dessus labouche de
decharge de la sdcheusect _.l'int_rieurdu dapet de decharge.
S'assurerque le conduitd'&acuatinnest fix_au clapet de
decharge _.l'aide d'nnebride de102mm (4 po).
D_lacer la s6cheuse_son emplacementfinal.Nepas _craserni
deformerle conduitd'&acuatinn.S'assurerquela s6cheuseest
d'aplomb.
_eck that you:
_. did not skip any steps.
€. installed all parts.
€. properly installed dryer legs.
€. leveled dryer.
have all the tools you started with.
Plugpowersupplycord (A) intogrounded outlet(B). Turn
power supplyon.
Readthe Useand CareGuideto fullyunderstandyournew dryer.
Selecta fullheat cyde (not the aircycle)and startdryer.Afterfive
minutes,opendryerdoor.Youshouldfeelheat insidedryer.
Iftheburner did notigniteand youdo notfeel heatinside the
dryer,shutthe dryerofffor5minutes.Then cheekthat:
_. controls are set in a runningor"On"position.
_. start buttonhas beenpushed fLrmly.
gas supplyfineshutoffvalveis open.
Repeat5-minutetest.Ifdryerstill doesnotoperateproperly,
cheekthe following:
__ dectricalsupplyis connected.
v/house fuseis intactand tight;orcircuit breakerhas not
v/tripped.
dryerdooris dosed.
Ifdryermakesanunusualnoise,checkthat dryerislevel.
V_ifier ce qui suit :
__ aucnne _tape n'a _t_ omise.
__ toutes les pi&es nnt _t_ install_es.
__ les pieds de h s_cheuse snnt cenvenablement install_s.
__ l'aplomb de la s_cheuse est correct.
_" tousles outils intlis_ snnt encore presents.
Brancher le cordon e'lectrique (A) sur nne prise de courant (B)
rell_e _.h terre. R_ablir le courant.
Lireattentivementle Guided'utilisationct entretienpourbien
comprendre lefnnctionnementde cetienouvelles_cheuse.
S_lectionnernn programmede s_chageavecchaleur (non le
programme de s_chage_.l'air)et mettrela s_cheuseen marche.
Apr_s(mq minutes, ouvrirlaporte de la s_cheuse.On devrait
sentirlachaleur _.l'int_rieur.
Sile br01eurne s'alfumepas ct si onne persuit pas de chaleur it
l'int_rieurde la s_cheuse,arr_ter la sdcheusependant5 minutes.
Eusuitev&'ifierce quisuit :
__ organesde commander_gl_s_nne positionde marche "On".
__ bouton de raiseen marchefermementenfonc_.
v/robinet d'arr_t delacanalisationde gazouvert.
R_ter letestde 5 minutes.Sila s_cheusene fonctionnetoujours
pas correctement, contr61erce quisuit :
__ eaccordementcorrect au r_seauflectrique.
v/fusibles de lamaisnn enbon gCtatet bien cennect_s, ou
disjoncteurfermi.
_/porte de las_cheuseferm_e.
Sih s_cheuse_mctnn bruit inhabituel,contr61erl'aplomb dela
s_cheuse.
11