EasyManua.ls Logo

Initiative Engineering F0525FF - User Manual

Default Icon
2 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION
OPERATION
1. Always press the handle down before turning the handle to the desired
position viz. Service, Backwash or Rinse.
2. If the line pressure is more , It is advisable to close the Inlet Valve before
turning handle.
SPECIFICATIONS
Inlet/Outlet/Drain connecons
1” BSP
Valve threading for Vessel Mounng
2.5" NPSM
Flow Rate
5m³/hr @0.35kg/ cm²
Max. Operang Pressure
5kg/ cm²
1.
2.
3.
4.
:
:
:
:
GENERAL ASSEMBLY
MULTIPORT VALVE F0525FF
SCOPE OF SUPPLY
1.Mulport valve
3.O & M Manual
2.Top and Boom Distributors
Take a 25 NB Rigid PVC riser pipe, longer than the height of the vessel and
solvent cement the boom distributor to one end of the pipe.
Insert this riser pipe into the vessel and cut the pipe from the top ensuring
that the height of the pipe(with the distributor touching the boom) is
42mm more than the top of the vessel.
Pour gravel and then filter media into the vessel. Cover the mouth of the riser
pipe while doing this so that media doesn't enter the pipe. Align the riser
pipe so that it is in the centre of the vessel opening.
Screw on the top distributor to boom of the MPV.
Screw on the MPV to the vessel ensuring that the riser pipe goes through the
top distributor into the MPV.
Make the inlet, Outlet and Drain connecons.
1
2
3
4
5
6
Sr. No. 273, Near Vitthal Mandir, Bhatewara Nagar,
Hinjawadi, Pune - 411 057, Maharashtra (India)
Tel.:+91 20 2293 2122, +91 20 2293 2123
E-MAIL:info@initiativeengineering.com
www.initiativeengineering.com
FRONT VIEW
294
DRAIN
INLET
147
20
29
113
29
89
SIDE VIEW
118
25
142
164
240
Question and Answer IconNeed help?

Do you have a question about the Initiative Engineering F0525FF and is the answer not in the manual?

Initiative Engineering F0525FF Specifications

General IconGeneral
BrandInitiative Engineering
ModelF0525FF
CategoryControl Unit
LanguageEnglish