EasyManua.ls Logo

INNOVAPLAS AQUARIUS DECK 5000 - User Manual

INNOVAPLAS AQUARIUS DECK 5000
3 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
REV. 01/21/2020 PN: PG:1
2257 route 139
Drummondville, Québec
J2A 2G2
1 year on pool step.
1 year on hardware.
MANUFACTURER WARRANTY
WWW.INNOVAPLAS.COM
WARNING
Install the step on a flat surface.
Do not jump or dive from the step.
Remove the step from water when temperatures drop below freezing.
In winter, the step should be stored in an area protected from snow.
Never lift the step by its handrails.
Use BATTERY operated tools to avoid electric shock near water.
Ensure no corrosive materials are added to the step or harware kit.
The step must be installed per manufacturer’s instructions.
File off all stripped or sharp edges before assembly to avoid injuries
and liner damage.
The manufacturer is not responsible for damages or injuries caused
by improper installation or use of product.
To ease the installation of handrails and bolts, use a screwdriver to
line up the holes.
AQUARIUS DECK 5000
Required tools
(not included)
A
Contents of Aquarius box SKU # 5000
x2
x1
x2
x2
x3
x1
x2
SCREW BAG 140-0068
x2
x1
2X
GUSSET
INSERT NUT
1) Insert the two gussets in the slots and slide them
toward the corners.
2) Assemble the two main modules with the six screws,
nuts and washers provided.
3) Snap the door between the top and bottom module
within the slots provided.
Sand
15 lbs
Sand
15 lbs
Sand
(not included)
Phillips #2
Phillips #3
7/16 wrench
x6 x6 x6
(1 IN.)
(1 ¹⁄2 IN.)
(³⁄4 IN.)
x2
(³⁄4 IN.)
x17 x12
A
B C D E F
x6
x6
x6
A B C
Phillips bit
Question and Answer IconNeed help?

Do you have a question about the INNOVAPLAS AQUARIUS DECK 5000 and is the answer not in the manual?

Summary

Safety and Preparation

General Safety Warnings

Important safety precautions and warnings for using the Aquarius Deck 5000, including installation and environmental conditions.

Required Tools

List of tools that are necessary for assembly and installation but are not included with the product.

Assembly Phase A

Initial Module Assembly

Instructions for inserting gussets into slots and assembling main modules with screws, nuts, and washers.

Assembly Phase B & C

Post and Foot Attachment

Attaching post ends, filler post ends, and feet to the step structure.

Deck Support and Handrail Integration

Securing deck supports and integrating the handrail onto the posts.

Assembly Phase D, E & F

Ballast and Handrail Cover

Instructions for adding sandbags for ballast and installing the small post cover on the handrail.

Step Submersion and Air Purging

Procedure for submerging the step into the pool and purging all air from underneath.

Final Placement and Post Adjustment

Positioning the step in the pool and adjusting the short post for proper fit and covering.

Assembly Phase G & H

Short Post and Deck Support Securing

Inserting the short post and attaching deck supports to the deck with screws.

Final Step Stabilization

Pulling deck supports upwards and fastening them to rear posts while pushing the step down.

INNOVAPLAS AQUARIUS DECK 5000 Specifications

General IconGeneral
BrandINNOVAPLAS
ModelAQUARIUS DECK 5000
CategoryLighting Equipment
LanguageEnglish