16
6.3.4. 24V current loop
To switch on all connected luminaires in case of a sub-
db failure, the terminals SL+ / SL- at the CLS have to be
connected to the NO contact at the related DPÜ (three
phase monitor).In case of a power failure at a monitored
sub-db, the 24V current-loop (SL+ / SL-) will be opened
and all luminaires connected to the CLS system are
switching on.To monitor more than one sub-db the NO
contacts at the DPÜs have to be connected in series.
Factory set the SL+ / SL- terminals at the CLS system are
connected with a wire strap.
Beside the monitoring for open circuit the 24V current-
loop can be monitored for short circuit in addition.
Therefor a Zener diode has to be connected to terminate
the related monitoring loop.
To avoid accidental activation, due to power shut
down during construction work, it‘s recommen-
ded to re-insert the wire strap at the SL+ / SL- ter-
minals (after testing) until end of construction.
6.3.4. 24V-Stromschleife
Um bei Netzausfall in einer Unterverteilung die Sicher-
heitsleuchten einzuschalten, sind die Klemmen SL+/
SL- an den Schließer der Dreiphasenüberwachung
anzuschließen. Bei Ausfall wird die 24V-Stromschleife
unterbrochen und alle Leuchten der Sicherheitsbeleuch-
tung schalten in den Notlichtbetrieb. Bei Überwachung
von mehreren Unterverteilern sind die Kontakte für die
Stromschleife in Reihe zu schalten.
Werksseitig sind die Klemmen mit einer Drahtbrücke
verbunden.
Die 24V-Stromschleife ist durch eine Schleifenüberwa-
chung auf Kurzschluss und Unterbrechung überwacht
werden. Hierzu wird eine Zenerabschlussklemme in die
jeweilige Schleife geschaltet.
Wir empfehlen nach Überprüfung, der Strom-
schleife, diese bis zum Ende der Bauarbeiten diese
wieder zu brücken. So wird das Einschalten der
Anlage verhindert, wenn baubedingt eine Siche-
rung abgeschaltet wird.