www.insigniarange.com Last Modied: 20/08/2020
02
Contents
Thank you for your purchase 3
Tips for assembly 4
Electrical/Pressure/Tool requirements 5
Box contents 6
Screw Pack contents 7
Levelling the Tray/Installing the Waste 8
Applying RubberGum 9
Installing the Right Side Panel and Right Column 10
Installing the Back Panel 11
Accessories Installaon 12
Installing the Le Column 13
Installing the Right Corner Upright 14
Connecng the Framework 16
Installing the Framework 17
Installing the Le Corner Upright 19
Installing the Le Side Panel 21
Installing the Roof 23
Installing the Right Front Fixed Glass 24
Installing the Right Front Fixed Glass Seals 25
Installing the Le Front Fixed Glass 26
Installing the Le Front Fixed Glass Seals 27
Installing the Door Handles, Seals and Magnets 28
Installing the Door Wheels and Doors 29
Valve/Water Connecons 30
Control Panel Connecons 31
Steam Generator Connecons 32
Connecng the Water Supply 34
Signing o your Shower 35
Control Panel Instrucons (Steam Version) 36
Control Panel Instrucons (Shower Cabin Version) 37
Bluetooth and Radio Tuning Instrucons 38
Parts list 39
Steam Room & Shower Safety Guide 40
Steam Room Usage Guide 41
Bathroom Electrical Zones 42
WEEE Compliance Statement 44