EasyManua.ls Logo

Insignia Premium Series User Manual

Insignia Premium Series
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
www.insigniarange.com Last Modied: 20/08/2020
INSTALLATION MANUAL
1400x900
Premium Series
ATTENTION INSTALLERS:
These instrucons must be
le with the customer
30 Day Technical Support: 01908 226545
This service is only available to customers from
the day of delivery Mon-Fri 10:30-15:30, please
have your suppliers details and your postcode to
hand before calling.
Replacements Parts: Inside of your warranty
period contact: www.insigniarange.co.uk/support
Spares/Replacements Parts: Outside of your
warranty period visit www.insigniaoutlet.co.uk
WARRANTY REG NO: _______________________
To claim your full 2 year warranty, register your shower within 90 days at: www.insigniarange.co.uk/warranty
CHECK ALL CONTENTS BEFORE BUILD COMMENCES. NO RETURNS CAN BE MADE
ONCE THE BUILD HAS STARTED AS IT IS DEEMED ACCEPTANCE OF PRODUCT!
Question and Answer IconNeed help?

Do you have a question about the Insignia Premium Series and is the answer not in the manual?

Insignia Premium Series Specifications

General IconGeneral
BrandInsignia
ModelPremium Series
CategoryBathroom Fixtures
LanguageEnglish

Summary

Essential Installation Tips

Parts Verification and Screw Pack Details

Important Parts Check

Crucial advice on checking parts before booking tradesmen.

Shower Tray and Waste Installation

Level the Tray and Install Waste

Instructions for levelling the shower tray and fitting the waste assembly.

Right Column and Side Panel Installation

Install Right Column and Side Panel

Instructions for fitting the right column and side panel to the shower base.

Shower Left Column Installation

Install Left Column

Instructions for fitting the left column to the shower base.

Shower Left Side Panel Installation

Right Front Glass Panel Installation

Left Front Glass Panel Installation

Shower Door Assembly

Water and Valve Connections

Valve/Water Connections

Details on connecting water supply to valves and shower components.

Control Panel Wiring

Steam Version Connections

Wiring instructions for the steam version control panel and generator.

Shower Cabin Version Connections

Wiring instructions for the shower cabin version control panel.

Steam Generator Connections

Steam Generator Connections

Connecting the steam generator to steam outlet, water inlet, and drain.

Main Water Supply Connection

Connecting Water Supply

Recommended setup for connecting the main hot and cold water supply.

Final Installation Checks and Sign-off

Signing off your Shower

Steps to perform to ensure watertightness and proper function before use.

Steam Version Control Panel Operation

Shower Cabin Control Panel Operation

Safety and Usage Guidelines

Steam Room & Shower Safety

Essential safety precautions for using the steam room and shower functions.

Steam Room Usage Guide

Bathroom Electrical Safety Zones

Bathroom Electrical Zones

Diagram and explanation of electrical safety zones in bathrooms (Zone 0, 1, 2).

Related product manuals