EasyManua.ls Logo

Instron 5980 Series User Manual

Instron 5980 Series
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
5980 Series Dual Column Floor Frames
System Support M10-16250-EN Revision J
The difference is measurable
®

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Instron 5980 Series and is the answer not in the manual?

Instron 5980 Series Specifications

General IconGeneral
BrandInstron
Model5980 Series
CategoryLifting Systems
LanguageEnglish

Summary

General Safety Precautions

Warnings

Lists specific hazards and precautions for safe operation of testing systems.

Chapter 1 Introduction

System Description and Terminology

Details the components and terminology of the testing system.

Components

Lists and describes the major components of an Instron electromechanical testing system.

System Components and Interconnections

Illustrates how hardware components are connected to form the complete testing system.

System Safety and Information Labeling

Explains the meanings of safety and information labels attached to the testing system.

Product Support

Provides information on obtaining documentation and assistance from Instron.

Chapter 2 Requirements and Specifications

Responsibilities

Details customer and Instron responsibilities regarding system setup and operation.

Site Requirements

Outlines necessary site preparation including location, floor loading, and power.

Power Requirements

Specifies voltage, current, and circuit breaker requirements for system operation.

Series 5980 Optional Configurations

Summarizes available frame options and combinations for the 5980 series.

Checklist for Site Preparation

A checklist to ensure all site requirements are met before system installation.

Chapter 3 Lifting and Handling

General Handling Precautions

Outlines essential precautions for individuals experienced in lifting and rigging Instron systems.

Packaging Dimensions

Provides dimensions and weights of packaged frames for site verification.

Unpacking Dual Column Frames

Details the steps for safely unpacking the dual column load frames.

Righting the Frame from a Prone Position

Instructions on how to move a horizontally shipped frame into an upright position.

Transporting Dual Column Frames

Covers procedures for moving load frames within a building or to a site location.

Chapter 4 Installation

Level the Load Frame

Details the procedure to level the load frame for stable and accurate test results.

Power Supply Compatibility

Verifies voltage compatibility and connection requirements for the power supply.

Connect the System Components

Describes how to connect the basic components of the electromechanical testing system.

First Time Startup

Guides through the initial configuration of the Bluehill software and system hardware.

Chapter 5 Maintenance

Preventive Maintenance

Guidelines for periodic inspection, cleaning, and lubrication to maintain optimal system performance.

Daily Maintenance Checks

Daily checks to ensure system readiness and secure connections before operation.

Lubrication

Details lubrication requirements for ballscrews, guide columns, and mounting surfaces.

Troubleshooting for Load Cells

Addresses issues with load cells, including calibration, creep, and overloading.

Spare Parts

Lists ancillary parts supplied with the 5980 Series load frames.

Related product manuals