EasyManua.ls Logo

Intertek PH01-SSB/HL2021A - User Manual

Intertek PH01-SSB/HL2021A
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
OWNER’S MANUAL
PATIO HEATER
MODEL #
DANGER
WARNING:
For Outdoor Use Only
WARNING
PH01-SSB/HL2021A
Question and Answer IconNeed help?

Do you have a question about the Intertek PH01-SSB/HL2021A and is the answer not in the manual?

Intertek PH01-SSB/HL2021A Specifications

General IconGeneral
BrandIntertek
ModelPH01-SSB/HL2021A
CategoryPatio Heater
LanguageEnglish

Summary

General Safety Information

Hazard Level Definitions

Explains DANGER, WARNING, and CAUTION symbols and their associated risks.

Critical Safety Warnings

Highlights specific warnings like outdoor use, improper installation, and severe hazard risks.

Specific Safety Precautions

Fire and CO Hazards

Details explosion, fire, and carbon monoxide risks, emphasizing ventilation and clearances.

Operational Safety

Covers gas leak response, safe service practices, and burn hazard warnings, including child safety.

Assembly Instructions

Component Identification

Lists and illustrates all parts included in the package for assembly.

Installation Steps Overview

Introduces the installation process and begins with attaching the wheel assembly to the base.

Installation Process

Attaching Wheel Assembly

Details the steps for attaching the wheel assembly to the heater base.

Attaching Ground Fixtures

Explains how to attach ground fixtures to the base, including options for preassembled or no water tank models.

Installation Process - Part 2

Attaching Post to Housing

Guides on how to attach the post to the top of the cylinder housing.

Tabletop and Reflector Stud Installation

Covers tabletop installation and attaching reflector studs to the screen cover.

Attaching Head Assembly

Details the process of attaching the head assembly to the post.

Installation Process - Part 3

Reflector Installation

Provides instructions for installing the reflector panels and center plate.

Connecting Hose and Regulator

Explains how to connect the hose and regulator to the propane cylinder, including specifications.

Leak Check Procedure

Pre-operation Gas Requirements

Covers gas supply pressure, BTU requirements, and cylinder specifications before leak testing.

Leak Testing Safety

Outlines essential safety measures to be followed during the leak detection process.

Performing the Leak Test

Provides step-by-step instructions for applying leak solution and identifying leaks.

Operation and Safety Checks

Critical Operation Hazards

Details Carbon Monoxide and Explosion/Fire hazards, reiterating outdoor use and clearance requirements.

Pre-Operation Checks

Lists essential checks before turning gas on and before lighting, including inspection and purging.

Lighting the Pilot Light

Explains the pilot light system and the initial steps for safe ignition.

Heater Lighting Procedure

Step-by-Step Ignition

Provides detailed steps for turning on the gas, lighting the pilot, and igniting the main burner.

Troubleshooting Ignition

Offers solutions for igniter failure, pilot light issues, and notes on initial use smoke and noise.

Normal Operation and Shutdown

Monitoring Heater Operation

Describes expected flame appearance and emitter screen color when the heater is on.

Re-lighting and Shut Down Procedures

Details how to safely relight the pilot and shut down the heater, including cooldown warnings.

Pre and Post Operation Checklist

Provides a checklist of safety and operational checks before and after using the heater.

Troubleshooting and Maintenance

Common Problem Resolution

Addresses issues like pilot not lighting, burner problems, and flame characteristics with solutions.

Routine Maintenance

Provides guidance on cleaning exterior surfaces, ensuring airflow, and checking for blockages.

Storage and Service

Storage Guidelines

Provides instructions for storing the heater between uses and during extended periods of inactivity.

Professional Service Recommendations

States that repairs should only be done by qualified personnel and advises allowing the heater to cool before service.