BPD series PV pumping inverter Installation guide
58
a. Plug at the cable direction.
b. Press the notch with thumb after plugging.
c. Pull out.
Figure 5.12 Pin removing
5.4.2 Installation of AC input and output terminals
(1) Strip the cable insulation layer by about 10 mm.
(2) Route the cable through the connector according to below diagram.
About 10 mm
Figure 5.13 AC connector cable stripping
(3) Connect the bare conductor to the connector based on the pin order in table 2.5.2,
and fasten it with a screwdriver.