EasyManua.ls Logo

IONPURE IP-VNX55EX-2 User Manual

Default Icon
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
IONPURE
®
VNX CEDI
Modules
Operation
&
Maintenance
Manual
IP-MAN-VNX-1019-EN
Rev 1
October 2019
This manual covers
model numbers:
· IP-VNX28EP-2
· IP-VNX55EP-2
· IP-VNX55E-2
· IP-VNX55EX-2
· IP-VNX55HH-2
· IP-VNX15CDIT-2
· IP-VNX30CDIT-2
· IP-VNX-MAX-1
· IP-VNX-MINI-1
Evoqua Water Technologies, LLC
558 Clark Road
Tewksbury, Massachusetts 01876, USA
ionpure@evoqua.com (email)
www.ionpure.com (web)
Visit web site to find local Ionpure contact

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the IONPURE IP-VNX55EX-2 and is the answer not in the manual?

IONPURE IP-VNX55EX-2 Specifications

General IconGeneral
BrandIONPURE
ModelIP-VNX55EX-2
CategoryControl Unit
LanguageEnglish

Summary

Guide to Using This Manual

Installation Precautions

Safety warnings and precautions during module installation.

Operational Safety and Procedures

Operating Precautions

Essential precautions to follow during module operation.

Pre-Installation Preparation and Requirements

Tools Required for Installation

Lists necessary tools for installation.

Connection Requirements

Electrical and Plumbing Connection Requirements

Details electrical and plumbing connection specifications.

Operating Requirements

Specifies acceptable environmental and operational conditions.

Module Installation and Operating Conditions

Electrical Requirements

Lists power requirements and connection details for VNX modules.

Feed Water Requirements

Specifies acceptable feed water quality parameters for VNX modules.

Water System Specifications

VNX Module Installation Procedures

Preparation for Installation

Confirms pre-installation requirements are met before installation.

Water Connection Configuration and Fittings

Details how to configure water connections and use fittings.

Module Connections and Sealing

VNX Piping Configurations

Electrical Connections and Safety

Electrical Connections

Details wiring and connection procedures for the junction box.

Electrical Precautions

Safety precautions related to electrical connections.

RO/CEDI System Integration

Startup Preparation and Requirements

Verify Feed Water Meets VNX Quality Requirements

Checks feed water quality against specified requirements.

VNX Module Start-Up Procedure

Water Recovery Management

MAINTENANCE AND TROUBLESHOOTING

Cleaning and Sanitization

Chemical Cleaning Procedures

Cleaning and Return to Service

Cleaning Solution Recipes

Troubleshooting VNX Modules

Troubleshooting Procedures

A diagnostic guide for identifying and resolving module issues.

Troubleshooting Flow Chart: DC Volts

Troubleshooting Flow Chart: Low Flow

Troubleshooting Flow Chart: Water Quality

Shutdown, Storage, and Disposal

Appendix A: Performance Data

Related product manuals