EasyManua.ls Logo

IrriGreen 2 - System Design (1 of 2); Optimal Head Placement Strategy; Initial Zone Setup

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System Design (1 of 2)
One Head per Zone
Place Head to Reach Farthest Corner, 25-35 Feet
Exact placement
not critical as you
can program the
head to the shape
of the zone
Don’t overlap
sprays or zones
Installation hint:
Walk in from the
corner with a wheel
and place a flag at
25-30’ for head
placement.
NOTE: The zone
start up point
(Position 1)
must be set at
least 10 feet so
the head has
enough
flow/pressure to
fully “pop up”.
After head is
fully popped up,
OK to set points
as short as 5
feet.
6

Other manuals for IrriGreen 2