Installation Dos and Don’ts
DO check flow to determine maximum throw before locating heads
DO Plug all heads together with a all cables before burying to test sprinkler connections
DO Install Cables in a trench or pull a run of 1 inch pipe as conduit
DO loop excess Cable inside a valve box adjacent to the head
DO use Cable Tees to branch out your Cables in different directions
DO use supplied End Plug to seal the last Sprinkler connector
DO add a second Controller Cable if branching off immediately from the Controller (NOTE: Heads must
be numbered accordingly; e.g. #1-4 on first controller cable and #9-12 on second controller cable)
DO protect all Digital Sprinkler connections with small valve boxes, buried below turf
DO use supplied Flex-Pipe for plumbing heads
DON’T cut and splice IrriGreen Cables
DON’T pull IrriGreen Cables with a vibra plow … DO pull 1” conduit for the cables if pulling pipe
DON’T use Teflon tape inside of Irrigreen heads
DON’T calibrate and program heads before flushing air from all digital AND valve zone piping