Do you have a question about the Isabella MINOR and is the answer not in the manual?
Prepare the ground with a carpet and sort poles according to the frame drawing for efficient assembly.
Pull the awning through the channel, ensuring level sides, and mount FixOn2 fittings.
Assemble E-poles into CM-cross, connect to roof pole via FixOn and CM-corner.
Insert A-poles into CV/CH corners and FixOn, tension CV/CH legs with regulator straps.
Position F-poles, relocate BS-legs to rear corners, and attach PVC profiles.
Slide PVC profile onto beading, clamp profile onto leg, and tension regulator straps.
Tension F, E, A, AM, and G poles in sequential order for a taut frame.
Peg corners, tension side panels, and peg the rest of the canvas, crossing rubbers at zip ends.