Information
• PENTA - UNICUT G12-16 •
• PENTA - UNICUT G18-19 •
På tegningen gråtmarkerede stænger.
På teckningen gråmarerade stänger.
The grey marked poles on the drawing.
Auf der Zeichnung die graumarkierten Stangen.
De grijs gemarkeerde stangen op de tekening.
Barres au dessin gris marqué.
En el plano son las barras gris.
Krt. 1/2:
Øvrige stænger.
Övriga stänger.
The rest of the poles.
Übrige Stangen.
Overige stangen.
Les autres barres.
Las otras barras.
Krt. 2/2:
G 18 : 125 cm.
G 19 : 135 cm.
G 18 : 125 cm.
G 19 : 135 cm.
G22-23
S
AX
SE
G22 : 115 cm
G23 : 125 cm
AXF
Steel & Glas Fibre frame made in Denmark by campion production DK 7100
Zinox
Stål • Metal • Stahl • Staal • Acier • Acero
CM
C
CF
2
1
B
V
AMF
CMF
F
B
FM
EF
VX
SV
EM
G
CF
1
2
FF
B
AX
C
E
AF
GF
A
B
VX
V
FF
GA
GG
FM
CB
FB
AM
CM
AMF
C
1
2
CF
B
CMF
F
B
1
2
SV
G
CF
V
VX
EF
FF
EM
E
AF
B
GF
V
VX
C
FF
A
FM
GA
GG
CB
FB
Penta
Penta
Penta
2
G20-21
S
AX
SE
G20 : 100 cm
G21 : 110 cm
Question and Answer IconNeed help?

Do you have a question about the Isabella Penta and is the answer not in the manual?

Isabella Penta Specifications

General IconGeneral
BrandIsabella
ModelPenta
CategoryTent
LanguageEnglish

Summary

Monteringsanvisning

Step 1: Prepare the Site and Poles

Lay out a carpet, assemble and position poles correctly on the ground.

Step 2: Thread Awning Canvas

Pull awning canvas through the caravan rail, ensuring even height on both sides.

Step 3: Assemble Main Frame Components

Mount FixOn2 brackets, raise CM-centre pole and (V+SV) leg, position AM-roof pole.

Step 4: Install Corner and Roof Poles

Place C-legs in regulator tabs, tension E-poles, mount AMF-roof pole and EF-roof poles.

Step 5: Tension Frame and Attach Panels

Tension poles in sequence (CMF, AMF, AM), raise B-legs, mount AF poles, zip down panels.

Step 6: Attach Canopy Poles

Mount EM poles, tension poles for the canopy (F, FF, FB, GG, FM).

Step 7: Install CozyCorner and FB Poles

Position CB leg (CozyCorner) inside, thread tube through side, tension CB leg and FB poles.

Step 8: Secure Gussets and Peg Down

Level interior gusset, peg corners, tension sides, and peg remaining canvas, crossing rubbers.