EasyManua.ls Logo

iseg SHQ 122 - Operation Check

iseg SHQ 122
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.6 Operation check
The correct operation of the module and the LC display can be verified as follows:
The “CONTROL”-switches must be in the upper position for manual control. For each channel turn the 10-turn potentiometer for
V
SET
by one revolution such that the number in vision panel shows “1” and the circular scale is in position “0”. This setting
corresponds to 10% of the nominal Voltage. I
SET
must be set to a value >10%. No cables are connected to the HV-output. After
switching on high voltage with the switch “HV-ON” the yellow LED turns on and a voltage of 10%±1% V
nom
is shown in the LCD. The
read LED (“ERROR”) must stay off and the displayed value for the current of the channel should be below 0.2% I
nom
.
SHQ series |Last changed on: 04.07.2017| www.iseg-hv.com 13/16

Other manuals for iseg SHQ 122

Related product manuals