EasyManua.ls Logo

ISOIL SBM 150 User Manual

Default Icon
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ISOIL
IMPIANTI
ISOIL IMPIANTI S.p.A. – Italy
Sede e Stabilimento
Head office and factory
24061 Albano S. Alessandro (BG)
74, via Madonna delle Rose
Tel. +39 035 4239.011
Fax +39 035 582078
E-mail: albano@isoil-impianti.it
www.isoilmeter.com
Uffici commerciali
Sales office
20092 Cinisello Balsamo (MI)
27, via F.lli Gracchi
Tel. +39 035 4239.011
Fax +39 02 66012457
E-mail: sales@isoil-impianti.it
Sede legale
Registered office
20124 Milano
24, viale Vittorio Veneto
Capitale soc. i.v. Euro 774.00
Codice fisc. E part. IVA 13066900153
C.C.I.A.A. MI – Reg. Impr. 86449/2000
OPERATOR’S MANUAL
P.D. METER TYPE
SBM 150
CODE: MA/027/00/EN
REV: 07
DATED: 09
/
2018

Questions and Answers:

ISOIL SBM 150 Specifications

General IconGeneral
BrandISOIL
ModelSBM 150
CategoryMeasuring Instruments
LanguageEnglish

Summary

Introduction

Warranty

Details the warranty period and conditions for the equipment, covering repair or replacement.

Manual Introduction

Provides an overview of ISOIL positive displacement meters and their use with various liquids.

Working Principles

Explains how the rotor and vanes interact within the measuring chamber to measure fluid flow.

General Safety Principles

General Safety Instructions

Outlines general safety instructions for installation, operation, and maintenance personnel.

Meter Operation Guidelines

Specifies rules for operating the meter, emphasizing trained personnel and operational limits.

Operator Instructions

Provides specific directives for operators regarding safety standards and adherence to manual instructions.

Servicing Safety Instructions

Details safety procedures to follow before performing any maintenance or servicing operations.

Operation Precautions

Lists precautions to ensure proper operation, including filling the meter and managing pressure.

Installation

Installation Precautions

Lists essential precautions for the correct installation of the meter to ensure performance and safety.

Start-up Precautions

Details critical steps and warnings for safely starting up the meter for the first time.

Maintenance

Disassembly Procedures

Guides on disassembling the meter into its main assemblies for repair or inspection.

Main Component Disassembly

Steps for disassembling primary components like the front cover and rotor group.

Rotor Disassembly

Instructions for safely removing and disassembling the rotor and its associated parts.

Assembly Procedures

Procedures for cleaning, inspecting, and reassembling meter components after maintenance.

Meter Storing Guidelines

Guidelines for properly draining and storing the meter and its accessories when not in use.

Calibrating Mechanism

Describes the calibrating mechanism and potential failure points, advising against adjustment changes.

Flow Meter Calibration

Step-by-step procedure for calibrating the flow meter using specific tools and adjustments.

Lubricating Oils

Lists recommended lubricating oils for the calibrating mechanism with their temperature ranges.

Post-Overhaul Testing

Explains how to test the meter after overhaul and calculate the error percentage.

Extraordinary Maintenance

Advises contacting customer care for extraordinary maintenance needs or system faults.

Spare Parts

Emphasizes using only original spare parts for meter maintenance to ensure proper functioning.

Maintenance Schedule

Provides a schedule for regular inspection and maintenance tasks based on time intervals.

Troubleshooting Guide

A section dedicated to identifying common symptoms, their possible causes, and recommended remedies.

Special Tools

Technical Data

Related product manuals