EasyManua.ls Logo

JAYLINE FR300W - Page 2

Default Icon
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
page 2www.jayline.co.nz
APRIL 2018
Congratulations on the purchase of your Jayline wood re.
Please read this installation and operation manual carefully.
The installation of this re must comply with the Installation Standard
AS/NZS 2918:2001 as well as any additional local requirements.
Please ensure you have all relevant permits prior to installation.
Keep this booklet as a reference guide.
INSTALLATION OF YOUR JAYLINE WOOD FIRE
Jayline recommends you use a suitably qualied installation technician to install your re. Your dealer
or heating specialist will be able to help with recommendations as well as advise on permits/consents
required for the installation in your area. Web address for NZHHA certied installers/service person.
www.nzhha.co.nz/nd-a-member/
Please follow carefully all dimensions and recommendations provided on the individual specication
sheet for your model of heater as these dimensions comply with the required New Zealand standard
(AS/NZS 2918:2001).
As safety and emissions performance can be aected by altering the appliance, no modications are
allowed without the written permission from the manufacturer.
INSTALLATION
1. Unpack the heater and check that there is no damage.
2. Ascertain the position of the roof penetration for the ue system.
A correctly installed ue system will normally prevent down draught problems during windy
weather and eliminate smoke spillage problems due to lack of draught.
3. Ascertain suitable position for appliance and size of oor protector and check the ceiling to ensure
that no major structural members will be aected by the path of the ue.
4. Check that the sub-structure is capable of carrying the heater (i.e. weight consideration on the oor).
5. Check measurements of the heater to combustibles or shield.
6. Locate the heater in the required position (also see ‘Fitting Seismic Restraint’ after installation
instruction #10).
7. Using a plumb line fastened to the ceiling, mark the centre of the ue penetration position and cut
the ceiling hole to the required size and frame out.
8. Install the ue system (see ue installation instructions supplied with ue system).
Remember:
The ue system should rise vertically from the appliance with as few osets as possible.
Osets should be limited as each change in direction creates a resistance to airow and makes
ue cleaning dicult.
The ue system must be well sealed with a minimum of 3 xings at each joint.
We recommend using ue sealant on all joints.
The ue pipe penetrating the chimney must continue to the minimum length of 4.6m from the top
of the oor protector to the cowl.