WARNING

RUPTURE HAZARD

Improper installation or misuse of tapping tools can cause pipe rupture and injury.

WARRANTY

1.0 RECEIVING AND HANDLING PIPE SHIPMENTS

1.2 UNLOADING

Safe methods for unloading JM Eagle PVC pipe using forklifts or other equipment.

2.0 TRENCH CONSTRUCTION

2.5 PLANNING FOR THRUSTING

Importance of thrust blocking and restraints for fittings and valves for safety.

2.6 PREPARATION OF TRENCH BOTTOM

Requirements for a smooth trench bottom and proper bedding for pipe support.

3.0 PIPELINE CONSTRUCTION

3.4 ASSEMBLY INSTRUCTIONS

Detailed steps for assembling pipe joints, including gasket and lubricant use.

3.9 THRUST BLOCKING AND ANCHORAGE AT FITTINGS

When and why thrust blocking and anchorage are needed at fittings.

4.0 PIPE EMBEDMENT

4.4 COMPACTION METHODS

Various methods for compacting embedment materials for pipe support.

5.0 PIPE TESTING AND REPAIR

5.3 PRESSURE-STRENGTH TESTS

Procedures and limits for pressure-strength testing of pipelines.

5.4 MAKING LEAKAGE TESTS

Establishing that a pipeline section will not leak or is within allowance.