Do you have a question about the JoeTap JT-NIT-RTD-4444 and is the answer not in the manual?
Details on the nitrogen supply connection and pressure requirements.
Explanation of the block distributing N2 pressure to multiple kegs.
Describes regulators controlling N2 pressure for each tap's infusion.
Explains N2 control solenoids activated by tower buttons for infusion.
Describes N2 vent solenoids that purge static pressure from the supply line.
Explains the chamber where N2 is blended with liquid product.
Information on the product kegs storing beverages for dispensing.
Details the function of particulate filters preventing clogs.
Instructions on operating and servicing the dispensing faucets.
Explains button logic for nitro activation and deactivation.
Describes the 2-second voltage limit function of timer relays.
Details the process of nitrogen infusion with coffee.
Troubleshooting tip for resolving unwanted nitrogen in beverages.
Explains pressure effects on froth and carryover.
How to reduce nitrogen carryover between pours.
Step-by-step guide to disassemble the faucet shank.
Process for faucet disassembly and part replacement.
Procedure for removing and replacing control box valves.
Lists and describes key refrigerator cooling components.
Guide for performing self-tests and interpreting error codes.
Button sequences for setting temperature and defrost.
Procedure to turn the refrigerator on or off using UI buttons.
List of error codes and recommended actions.
Initial steps to access and remove the inverter cover.
How to disconnect wires and test voltage for inverter issues.
How to measure compressor voltage to diagnose inverter or compressor failure.
Steps to remove bracket and disconnect UI board harness.
Guide for installing new UI board and handling insulation gasket.
Cleaning mounting surface and securing the UI bracket.
How to apply the adhesive backer from the new overlay.
Overlay peel and screw removal before harness disconnection.
Disconnecting harness and keeping UI board for reinstallation.
Cutting damaged connector and preparing cooler for drilling.
Drilling hole, feeding cable, and installing grommet.
Securing cable and sealing the drilled hole with silicone.
Aligning UI board into bracket and securing it.
Cleaning mounting surface and applying new overlay.
Steps to remove lower front vent screws.
Removing rear panel and locating wiring for UI replacement.
Feeding new cable through vents and routing it.
Pulling cable taut and mounting the front vent.
Connecting new cable and bundling all harnesses.
Mounting back panel and testing UI board operations.
Preparing sanitizing solutions at correct concentration.
Steps for flushing faucets with cleaning solution.
Importance of letting cleaning solution sit for 5 minutes.
Detailed steps for rinsing the system with water.
Procedures for turning off gas and releasing pressure.
Cleaning and reassembling filter bowls.
Inspecting and cleaning faucet tips for debris.
Wiping down faucets, handles, and surrounding areas.
Cleaning the dump pan and grate and reinstalling it.
Connecting product tanks and flushing lines with product.
| Brand | JoeTap |
|---|---|
| Model | JT-NIT-RTD-4444 |
| Category | Accessories |
| Language | English |
Loading...