5.18  Measure  and  record  the  distance  from  the  center  of  the  DCST  assembly  to  the 
measure point of the tool string; typically the CCL. Also record the part numbers and 
date codes of the explosive components used in the assembly. 
5.19  The DCST assembly is now ready to be run into the pipe. The safety procedures 
must  be maintained  until the  assembly has been ran  below ground level: typically 
200 feet (70 m) below ground on land or 200 feet (70 m) below the seabed offshore. 
5.20  After Attempting to make the cut; even if there are good indications that the DCST 
functioned;  it  is  still  necessary  to  go  back  into  ‘SAFE’  and  ‘Radio  Silence’  when 
coming out of the hole while still 200 feet (70 m) below ground level on land or 200 
feet  (70  m)  below the  seabed  offshore.  Check that the grounding lines  are still in 
place and clear the disarming and disassembly area of non-essential personnel. The 
safety precautions must remain in force until the explosives responsible person has 
seen  that  the  cutter  functioned  and  has  confirmed  that  the  cutter  is  no  longer  a 
potential explosive hazard. If the cutter did not function it must be disassembled and 
disarmed  before  the  safety  procedures  are  lifted.  The  disarming  and  disassembly 
procedure follows.