STEP 4. BATTERY
Please read the enclosed Fazua manual on how to turn on and check the battery charge.
It may need charging before your rst ride.
STEP 5. FINAL CHECKS
Before riding you must read through the enclosed Fazua manual to familiarise yourself
with the operation and care of the Fazua system (Drivepack, Battery Pack, Remote and
Charger). You also check through your bike making sure each part is tightened to the
correct torque setting and your tyres are at a suitable pressure. Please read through the
rest of this manual before riding.
Check the following Torque list below for reference alongside the image.
1 - Bar Clamp bolts - 6Nm
2 - Steerer clamp - 6Nm
3 - Brake Mounting bolts - 8Nm
4 - Pedals - 30-34Nm
5 - Seat Clamp bolt - 5Nm