EasyManua.ls Logo

Kipor KDE19EA3 - 4. START AND SHUTOFF THE ENGINE; Engine Break-in and Starting Procedures

Kipor KDE19EA3
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
2. Insert the key to electric door lock and turn to START position, the unit is
preheating and starting, then hands off , the key will back to ON position
automatically
3. Smart panel control can preheat automatically when start, the time can be set.
4. START AND SHUTOFF THE ENGINE
4.1 Break-in Period (initial 50 hours)
4.2 Start the Engine
OFF
ON
Breaker
23
The electric eye color of battery electric
6. MAINTENANCE
6.1 Maintenance schedule
our authorized agent unless the owner

Related product manuals