EasyManua.ls Logo

Klarstein Brooklyn - Installation

Klarstein Brooklyn
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
EN
INSTALLATION
When install a Heat pipe Refrigerator, ventilation should be considered seriously, please
refer to the following:
• There should be left at least 200 cm³ for ventilation
• The distance between wall and refrigerator side should be at least 20mm
• The bottom should be left at least 50mm for air owing
• Air passing through must not be preheated
• Entire cooling system should be considered in the ventilation
the following four pictures show four installation ways:

Table of Contents