EasyManua.ls Logo

KNECHT E 50 R - Page 4

Default Icon
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
4. Transport 24
4.1 Means of transport 24
4.2 Transport damage 24
4.3 Transport to another installation site 24
5. Installation 25
5.1 Selection of qualified personnel 25
5.2 Installation site 25
5.3 Supply connections 25
5.4 Settings 25
5.5 Initial start-up of the grinding machine 26
6. Commissioning 27
7. Operation 29
7.1 Grinding hand knives 29
7.2 Changing the wet-grinding belt 31
7.2.1 Adjusting the wet-grinding belt 33
7.3 Changing the polishing / deburring rings and polishing paste 36
7.4 Adjusting the polishing / deburring ring 38
7.5 Changing the test medium of the sharpness testing device 39
7.6 Replacing the coolant 40
8. Control 41
8.1 Manual functions 41
8.2 Setting the language 43
8.3 Loading product data 45
8.4 Changing product data 46
8.5 Setting up an internet connection 47
9. Care and maintenance 48
9.1 Lubrication 48
9.1.1 Lubrication schedule and lubricant table (one-shift operation) 48
9.2 Cleaning 49
9.3 Maintenance plan (one-shift operation) 52
Table of Contents

Table of Contents

Related product manuals