1. Top cover 8. Drain switch
2. CO2 cartridge sheath 9. Drip tray
3. Tap handle 10. CO2 pressure relief valve/ knob
4. Tap 11. Door lock button
5. Keg lifter 12. Rear cover
6. LED display 13. Power cord & plug
7. Digital control button 14. AC power switch
INSTALLATION & OPERATION
A. INSTALLATION
1. Take out the beer cooler from its package. Place the beer cooler
on a steady and horizontal surface, and make sure the beer cooler is
at least 5inches/10 cm away from other appliances or wall on each
side so as to allow correct ventilation on the appliances, get better
performance.
Figure 6 Figure 7
2. Install the tap handle connect the tap, make sure both end fit
together perfectly. (Show as Figure 6)
3. Set the water drip tray into the notch provided. (Show as figure 7)
4. Plug the beer cooler.
Note: Do not connect or disconnect the electric plug when your
Handle
Faucet
Drip tray