2. Install the Valve - Single Showerhead Only
Install the valve on the support framing so the ″UP″ mark on the
valve is facing upward.
Connect the water supplies to the valve body using elbows, 3/4″
copper tubing or pipe, and adapters (if needed). Use thread
sealant on all threaded connections.
IMPORTANT! Secure the pipes to the framing.
Temporarily install a 1/2″ nipple to the shower elbow so it
extends at least 2″ (51 mm) beyond the finished wall.
72" (1829 mm) - 78" (1981 mm)
To Floor (Typical)
3/4" Adapter or
Solder Direct
3/4"
Copper
or Pipe
3/4"
Elbow
48" (1220 mm)
to Floor
Hot Supply
Cold Supply
Temporary
Nipple
Kohler Co. 5 1205550-2-C