EasyManuals Logo
Home>Kohler>Plumbing Product>K-5024-T

Kohler K-5024-T User Manual

Kohler K-5024-T
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
Roughing-In Dimensions
* The urinal complies with ADA requirements when the rim is
mounted no higher than 17” (43.2cm) from the finished floor.
1. Preparation
Turn the water supply off.
Install or relocate the supply tubing and waste pipe as necessary to
conform to the roughing-in dimensions.
Install the shut-off valve.
Install adequate support framing as needed.
Kohler Co. 3 1002334-2-B

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler K-5024-T and is the answer not in the manual?

Kohler K-5024-T Specifications

General IconGeneral
BrandKohler
ModelK-5024-T
CategoryPlumbing Product
LanguageEnglish

Related product manuals